Apr 6, 2022, 3:36 PM
Journalist ID: 1114
News ID: 84707384
T T
0 Persons

Iran to resume gas production in Salman Field within a month

Apr 6, 2022, 3:36 PM
News ID: 84707384
Iran to resume gas production in Salman Field within a month

Tehran, IRNA – Iran is scheduled to resume gas production in Salman Field, shared with the UAE, within a month after a damaged pipeline is repaired, according to an oil and gas official familiar with the matter.

Amir Salari said on Wednesday that the repair of the damaged pipeline in a depth of 60 meters under the sea is being carried out by a domestic contractor.

He added that Iran has also plans to replace the pipeline pumping gas from the offshore field to Siri Island with a new one within a while as the pipeline has been repaired for several times.

9341**2050

Follow us on Twitter @IrnaEnglish 

0 Persons

Your Comment

You are replying to: .